GAUR ALARIS

Gaur Alaris and Jewar Airport's Phase 2 — the same distance, a bigger airport.

How far is Gaur Alaris from the airport's Phase 2?

The same distance as the airport overall: approximately 16 km*, per the developer's official deck. Phase 2 is future capacity being added at the same Noida International Airport site as the Phase 1 terminal already operating — not a second airport somewhere else — so the drive-time figure doesn't change by phase. What changes is what the airport can do once later phases open.

*Per the Gaur Alaris developer deck; verify current drive time independently before a site visit.

What "phased" actually means at this airport

Per the developer's material on the corridor: Noida International Airport, Jewar, has been operational since 2026, with Phase 1 rated at approximately 12 million passengers a year. The same material describes the airport's planning envelope taking that to roughly 70 million passengers a year as later phases are built out — positioned as India's largest airport, and planned among the world's largest aviation hubs at full build-out. It's a single site of 1,300+ hectares, developed by Zurich Airport International AG, growing in stages rather than a series of separate airports.

  • ·
    Phase 1 — operating todayCommercial flights since 2026; approximately 12 million passengers a year capacity, per the developer's material.
  • 1,300+ hectares, one siteThe airport's full footprint sits on this single site — later phases expand what's built there, not where it is.
  • ·
    Roughly 70 million passengers, at full build-outPer the same material, describing the airport's planning envelope as later phases complete — not a single "Phase 2" capacity figure on its own.

Per the Gaur Alaris developer deck and homepage material. Verify current phase capacity and timelines independently before deciding.

What we don't have a sourced figure for

We have not seen a dated developer document that states a specific opening year, or a capacity figure scoped only to "Phase 2" as distinct from the airport's later build-out generally. If you've been quoted a specific Phase-2 date or number elsewhere, treat it as unverified until our desk can show you the same claim in writing — we'd rather say "we don't have that sourced" than round up. For the fuller distance picture — airport, Eastern Peripheral Expressway, Noida–Greater Noida Expressway — see our location page.

Airport distances are also project-specific and do not transfer between projects on this corridor. The Gaurs studio project further along the same expressway, Gaurs Studio Bento at Sector 19 inside Gaur Yamuna City, publishes its own landmark ledger from a different address to the same airport. It is at an earlier stage than Sector 22-D too: no Bento-specific UP-RERA registration surfaced on our own register read of 21 August 2026, nothing there is booked or sold, and only a refundable Expression of Interest is taken. Which projects on this corridor do carry a registration is searchable on our own UP RERA Tracker.

Questions buyers actually ask

How far is Gaur Alaris from Jewar Airport's Phase 2?

Approximately 16 km*, per the developer's official deck — the same figure quoted for the airport overall. Phase 2 is being built within the same airport site as the operational Phase 1, not at a separate location, so no different distance exists to quote.

Is Jewar Airport's Phase 2 built somewhere else, further from Gaur Alaris?

No indication of that in any source we've read. The airport is described in our material as a single site of 1,300+ hectares being built out in phases, not as separate airports at different locations. Treat the ~16 km figure as the one distance to plan around, current and future phases alike.

What is Jewar Airport's Phase 1 capacity today?

Approximately 12 million passengers a year, per the developer's material — the airport has been operational since 2026.

How big is the airport expected to get as later phases are built?

The developer's material describes the airport's planning envelope taking capacity to roughly 70 million passengers a year as later phases are built out, positioning it among the world's largest aviation hubs at full build-out. We don't have a sourced date or a phase-by-phase capacity breakdown beyond that — treat any more specific "Phase 2 opens in [year]" claim as unverified until the desk can show it in writing.

Gaur Alaris se Jewar Airport ka Phase 2 kitni door hai?

Lagbhag 16 km*, developer ki official deck ke mutabik — yehi figure poore airport ke liye bhi hai. Phase 2 usi airport site par ban raha hai jahan Phase 1 abhi operational hai, kisi alag jagah par nahi — isliye koi alag distance nahi hai.

Is this the official Gaurs website?

No. This is not the official website of Gaurs/Gaursons. It is run by an independent UP-RERA registered channel-partner advisory, agent registration UPRERAAGT000309/01/2026. Call or WhatsApp our sales desk for current, verified information.

Plan your site visit

Ask the desk for current airport-side drive-time estimates while you're at it. Share your number and our sales desk confirms a visit slot.